Zetron is an American manufacturer of critical communication systems and a global leader in connecting communication centers with field operations, personnel, and constituents. They enlisted Apex to move and decommission their office which spanned three floors and 90,000 sq. ft. down to 30,000 sq. ft. We filled 14 53' trailers to move to their new space and disposed of over 150 benches, 200 8x8 cubicles, and 300-speed packs of recyclable items. To encourage sustainability and cost savings, we worked with Zetron to recycle all excess steel from shelving and workstations. 

  • Size: Downsized from 90,000 sq. ft. to 30,000 sq. ft.
  • Location: Redmond, WA
  • Project Duration: Planned as a 2-month job condensed into 3 weeks to save our clients hundreds of thousands in holdover rent.